Vessels

Cable Laying Barge (Repair, Burial)

02_asahi-s.jpg

Asahi

Purpose Cable and Water Pipeline Installation, Burial, Repair and Recovery
Load Capacity 3000 ton
LOA 80.00m
Breadth 24.00m
Depth 4.50m
Draught 3.46m

Onboard Equipment and Facility

Control Room Radar, DGPS, Wind Sensor, Depth Sensor, GPS Plotter
DPS 1200ps x 4 unit, KAWASAKI KICS-5000(4500)
Crawler Crane Capacity 120 ton, KOBELCO 7065-2 
ROV SMD
Meeting Room 18㎡ x 1
Accomodation 7 rooms(30 beds)
Shower Room(4 rooms )